Boiler VESKO-B for Medzilaborce in Slovakia

The assembly of the boiler for the town of Medzilaborce in Slovakia was finished in June 2016. The boiler will be used to heat the city, and the project also included the reconstruction and construction of hot-water distribution systems. The boiler VESKO-B with a capacity of 3,0 MW was delivered to the building site at the end of March, at the beginning of June it was put into test operation. Especially green chips from local forests will be used as fuel.